PEI Corporate Experience – Project Overview & Highlights

PROJECT OVERVIEW
Project Name: AT&T Wi-Fi Distributed Antenna System (DAS)
Customer: Aero Communications Inc. (ACI)/Brauch Faser LLC
Role: Subcontractor
Contract Type: Cost Plus Fixed Fee (CPFF)
Contract Value: $230K
Performance: Sep 2014 – Jan 2015
Project Description:
Installation of fiber-optic and electrical wiring via directional drill method at the North Carolina (NC) State football stadium and various locations in Northern VA. Total project footage was over 12,000 feet. This system allows AT&T to provide real-time Wi-Fi access to its customers.

Performance Narrative
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Management / Implementation
  • PEI managed the project from start to completion, including all procurement, permitting, design and implementation activities.
  • PEI executed the project out-of-state and through careful program management, PEI assured that the project was implemented within budget and schedule.

PROJECT OVERVIEW
Project Name: Agora Data Center Implementation
Customer: Agora Publishing Company
Role: Prime
Contract Type: Cost Plus Fixed Fee (CPFF)
Contract Value: $270K
Performance: Feb 2014 – June 2014
Project Description:
PEI provided a turnkey solution to survey, design, build and implement the Agora private fiber ring. The total project integrated 10 properties in downtown Baltimore and successfully increased the data transmission speed, reliability and security across all properties.

Performance Narrative:
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Management / Implementation
  • Upon Customer request, PEI designed a turnkey solution to build and implement a private fiber ring. PEI was awarded this sole source project due to a comprehensive proposal and excellent past performance.
  • PEI projected technical cost estimates and through careful program management assured that implementation and closeout was within budget and schedule.
  • PEI managed the project from start to completion, including all procurement, permitting, design and implementation activities.

PROJECT OVERVIEW
Project Name: City of Baltimore CCTV Crime Prevention
Customer: Mayor’s Office of Cable and Communication Baltimore City
Role: Prime
Contract Type: Cost Plus Fixed Fee (CPFF)
Contract Value: $2.5M
Performance: 1992 – present

Project Description:
PEI designed a fiber backbone network and implemented over 500 CCTV cameras in its downtown area as well as other high crime areas. PEI performed surveys, fiber design and construction, implementation and ongoing maintenance. Technology assisted law enforcement agencies with investigations.

Performance Narrative:
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Management / Implementation
  • Project was completed 6 months ahead of schedule. Additionally PEI was able to design , install and complete the Jewish community as part of the extended implementation for the city.
  • City & Community Support
  • A study, released by the Urban Institute’s Justice Policy Center, found that Baltimore’s network of more than 500 cameras has driven down crime in most areas and has given taxpayers a return of as much as $1.50 for every dollar spent on the system.

PROJECT OVERVIEW
Project Name: Johns Hopkins Hospital (JHH) Biotech Park, Baltimore MD
Customer: Tele-Tector MD
Role: Subcontractor
Contract Type: IDIQ
Contract Value: $550K
Performance: Aug 2009 – Sept 2012
Project Description:
Network cabling and infrastructure support to install CAT-5 data and CAT-5 backbones for all access controls
Data communications system design, integration, testing, installation, and migration support
CCTV management and secure areas at the JHH Biotech park facilities.

Performance Narrative:
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Management/ Coordination.
  • PEI support assured alignment with all requirements; creation and support of schedules and priorities; the definition of roles and responsibilities; and thorough understanding of subtask requirements.
  • PEI projected technical cost estimates and through careful program management assured that implementation and closeout was within budget and schedule.

PROJECT OVERVIEW
Project Name: Ritz Carlton, Baltimore MD
Customer: COMCAST CABLE
Role: Subcontractor
Contract Type: Cost Plus Fixed Fee (CPFF)
Contract Value: $525K
Performance: Aug 2006 – March 2008
Project Description:
PEI provided network cabling and infrastructure support to create a State of the Art/Smart Cable* communications system. PEI provided the following services: data communications system design, integration, testing, installation, and migration support to ensure reliable, immediate, uninterrupted service 24 hours a day, 7 days a week. PEI installed and maintained data, phone and CATV communication services to help ensure 24×7 availability .

Performance Narrative:
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Management/Coordination:
  • Project management support assured alignment with all requirements; creation and support of schedules and priorities; the definition of roles and responsibilities; and thorough understanding of subtask requirements.
  • PEI projected technical cost estimates and through careful program management assured that implementation and closeout was within budget and schedule

Project Name: Comcast of Maryland
Customer: COMCAST CABLE
Role: Subcontractor
Contract Type: Cost Plus Fixed Fee (CPFF)
Contract Value: $17Mill
Performance: Aug 1994 – March 2011
Project Description:
PEI provided network cabling and infrastructure support to create a State of the Art communications systems. PEI provided the following services: Survey, Make Ready, communications system design, integration, testing, installation, and migration support to ensure reliable, immediate, uninterrupted service 24 hours a day, 7 days a week. PEI installed and maintained Fiber, Coax and Maintain communication services to help ensure 24×7 availability .

Performance Narrative:
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Management/Coordination:
  • Project management support assured alignment with all requirements; creation and support of schedules and priorities; the definition of roles and responsibilities; and thorough understanding of subtask requirements.
  • PEI projected technical cost estimates and through careful program management assured that implementation and closeout was within budget and schedule

PROJECT OVERVIEW
Project Name: ITS (Infrastructure Traffic System) Baltimore City
Customer: MasTec
Role: Subcontractor
Contract Type: Cost Plus Fixed Fee (CPFF)
Contract Value: $3.0M
Performance: 1996-1998
Project Description:
The ITS system selected by Baltimore to coordinate Right of Way (ROW) activities was implemented over a two year period. It provides real-time information on infrastructure projects across the City via a web-based system accessible to all of the stakeholder groups. Each project is mapped via GIS data points. A clickable map provides key details such as location, timeline, scope, schedule, cost, and points of contact for each project. PEI performed installation, fiber construction connecting 25 nodes and integration of the system.

Performance Narrative:
Schedule: Met
Requirements: Met
Budget: Met
Customer Rating:

  • Extremely Satisfied
  • Project Cost Savings
  • Because the system enables coordination of roadway pavement cuts, it reduces the number of cuts necessary and therefore allows for smoother pavement and longer pavement life. Efficient coordination allows limited budgets to go further providing cost savings. Over the first year the system was used, the City of Baltimore reported a cost savings of between $350,000 and $500,000 in paving costs.